Thursday, October 12, 2017

Living in a building season



The first time we came here I knew in my heart if we were called to move here we would say yes. This place has grown a lot since we moved here Boxing Day 2012, the camp experienced growth in staff numbers and a few years later the growth of our Programs with the addition of Explore. These blessings came with the need for more accommodations and this began the building season. Troy has built 3 staff accommodations (there are some posts about them in 2013/2014) once those were done it was not long before another building project was being talked about, this project being the 3 duplex cabins built to house the Explore students ( posts on these cabins spring 2015) Thinking this might be the end of the building for a little while another building was being talked about...More housing for staff, Troy is currently building a house with a basement that will be turned into a walk out suite for staff and the upstairs will be housing for the Directors of Explore Program so they too can have a place to call home here at camp. This project began to take place this spring and will take most of the year...possibly longer to be built. The basement has been poured, inspected, and now framed up and the floor is being added. I am hoping they can frame the upstairs and get the roof on before too much snow falls on the ground but it is not looking good for that.

Here are some pictures of the house so far




 
These last two pictures are from yesterday it is hard to tell but the floor is being put together. I will post more pictures of the house once walls and the roof are up.
 
 
Happy Fall 

No comments:

Post a Comment